KINGFISHER WELL PADS
Geotechnical investigations for wall Pads • Drilling • Laboratory testing • Geotechnical analysis and reporting Geotechnical Analysis
-
REFURBISHMENT AND EQUIPPING OF KAWOLO GENERAL HOSPITAL
Location: The site was located along the Kampala-Jinja Highway approximately 50kms from Kampala City. Scope: Geotechnical Investigations Included: Core drilling of two boreholes each to refusal or to a maximum of 10m and excavation of nineteen trial pits each to a maximum of 3m. Assess the strength of the soil profile through the Standard Penetration Test (SPT) at ...
-
KATUNGURU-ISHASHA
Geotechnical and materials investigation for design of proposed upgrade of Katunguru – Ishasha 88km road to bituminous standard. The scope involved geotechnical studies through trial pitting, dynamic cone penetrometer testing and subgrade soil sampling for laboratory testing. Materials investigations studies through materials sourcing (borrow materials, quarry (rock and sand) and water), field density tests and sampling for laboratory testing.
-
MUHANGA– KISIZI–RWASHAMAIRE ROAD (78.8km)
Location: The Muhanga – Kisizi – Kiyenje – Kebisoni and Kiyenje – Rwashamaire (78.8km) road project is located in the southwestern districts of Rukiga, Rukungiri and Ntungamo. The project links local urban centres of Kiyenje and Kisizi to the bituminous paved National Roads, that is, Ntungamo – Rukungiri and Mbarara – Kabale Highways at Rwashamaire/ Kebisoni and Muhanga respectively. Scope: The works so far carried out include excavation of alignment trial pits at 1km intervals along the existing gravel road and conducting Dynamic Cone Penetrometer Test (DCP) along the existing road at ...
-
PROPOSED UGANDA VINCI COFFEE COMPANY-NAMANVE
Location: The proposed UVCC coffee processing plant is located within the Kampala Industrial and Business Park (in Mukono District) approximately 16km from Kampala town along the existing Kampala – Jinja Highway. The site perimeter is about 1.4km with an approximate coverage area of 27 acres. The site is bound by Kyagulanyi coffee factory to its western side, Steel ...
-
BUSEGA – MPIGI EXPRESSWAY PROJECT
Location: The proposed Busega – Mpigi Expressway (23.7km) is located within the central region of Uganda. The Project area is located on the Northern Multimodal Corridor and it is expected to facilitate the logistics within GKMA and also improvement of traffic flow on the Northern Multimodal Corridor. The Project starts at Busega (at the Kampala Entebbe Expressway approximately 12.5kms from Kampala City Center) ...
-
KAMPALA FLYOVER CONSTRUCTION AND ROAD UPGRADING PROJECT
LOCATION: The Project (Lot 2) lies between Kibuli junction (along Mukwano Road) and Jinja Road (at a point about 250 m to the east side of Africana Roundabout) via Mukwano Road and Access Road including some parts of Yusuf Lule Road (between Kitgum House Junction and Garden City Roundabout) and Nile Avenue (about 250m from Garden ...
-
KAMPALA FLYOVER PROJECT
LOCATION: KAMPALA, CENTRAL UGANDA CLIENT: ICS under UGANDA NATIONAL ROADS AUTHORITY (UNRA) DATE: DECEMBER 2016 Kampala City has recently faced significant growth in traffic that have been a strain on the existing road capacity. As part of measures to alleviate gridlock within the city, JICA commissioned a study in 2010 and later on updated in ...
-
NEW TAXI PARK PROJECT
This project is intended to help in decongestion of the Central Business District by providing a multi-storeyed car park thus reducing on-street parking and relieving the already congested roads.
Services included:
Core drilling and logging of 5 boreholes to a minimum 20 meters each in the New Taxi Park, Kampala.
-
PROPOSED UNRA HEADQUARTERS BUILDING
The building site is located at Kyambogo along the Kampala-Jinja Highway at the eastern outskirts of Kampala City approximately 6km from the city center.
Alpha was commissioned by ICS to carry out preliminary geotechnical investigations.
-
KAMPALA SOUTHERN BYPASS
The project comprises of a divided 4-lane 17km new road with over 12 km of road traversing through swamps and elevated on a via duct and allows connection to junctions through 4 interchanges and Roads over Bridges for links and expected partly to be fenced to allow limited access with lighting and provisions for toll plazas if the choice to toll is adopted.
-
KAMPALA – JINJA EXPRESSWAY
LOCATION: KAMPALA TO JINJA, CENTRAL UGANDA CLIENT: ICS under UGANDA NATIONAL ROADS AUTHORITY DATE: JANUARY 2014 – SEPTEMBER 2014 The Project road forms a component of the vital international highway connecting Uganda to the port of Mombasa on the Kenya coast. The project comprises of a divided 6-lane new road over the 4 km, 6-lane to Mukono ...